Our turnkey 8 tph – 8 bar – 260 oC superheated steam boiler project has been commissioned successfully. All main and auxiliary equipment was assembled at our factory in order to reduce installation time and cost.
Project location: Bandırma / Balıkesir / Turkey
Project purpose: Steam supply to the steam turbine
Plant capacity: 1543 mWe in total
Plant type: Natural gas combined-cycle power plant (NGCC)
Project scope;
* Saturated steam boiler
* External superheater
* Spray-scrubber type deaerator
* Blowdown tank
* PLC-controlled automation system
* Water quality monitoring and chemical dosing system
* Nitrogen blanketing system
* Fire extinguishing and alarm system
* Containers
* Piping for steam, water, air and similar lines (including heat-tracing, insulation, etc.)
* 2nd-stage natural gas pressure reducing stations